v26.18
We are pleased to share the latest updates and enhancements introduced in Version 26.18. Below are the key features and improvements, along with their respective locations for easy reference.
New Features​
Enhancements​
1. Line Inspection Production / Stock Integration​
Location: You can access Line Inspection, Control Task and Non Confirmation Review under Production & Quality → Operations. Movements can be seen in the Stock Ledger Report under Production & Quality → Reports.
Details:
Production flow
- Each Line Inspection is saved as a new history entry in Control Task. Earlier entries are never overwritten.
- The inspected process shows the latest effective status.
- A serial moves to the next process only when its previous process is Approved or Conditionally Approved.
- A Rejection, Defect, Rework or Hold also marks the later completed processes with the same status, with a note that it was raised by the Line Inspector.
- Later processes cannot be inspected while an earlier process of the same serial is rejected, on rework or held. A clear message explains why.
- The Rework and Pending Validation tabs list the serials currently in Rework or Hold.
Stock
- Stock sits at one process, the furthest one completed.
- A Rejection, Rework or Hold moves stock once, from that process into the inspected process's bucket for that status.
- The Stock Ledger shows Line Inspection, Rework or NCR as the source of each movement.
Re-approval
- Approving again (Line Inspection, NCR, Rework tab or Pending Validation) brings the later processes back to Approved and returns the stock.
- When an NCR is approved, OP30, OP40 and OP50 all return to Approved. OP50 is the active process and holds the stock.
- An NCR decision can be revised after approval, for example from Approved to Rework, and stock moves from the process that currently holds it.
- Submitting the same NCR decision again does not create duplicate entries or stock movements.
NCR
- A Machining Defect or Casting Defect raises the Non-Conformance Review automatically.
- The NCR defect list shows each defect once, and Submit is available only after a valid defect is selected.
Screen
- The search lists only serials that have completed a process. Part Status is always shown.
- The inspect (pencil) button appears on the current record of a process. Older history entries are view only.
- A result summary is shown after each submit: serial, process, previous and new status, stock position, later processes reverted, and NCR raised.
- Approved cannot be selected when a measured value is outside the specification range.
- Clear on-screen notifications guide required entries and confirmations.
Overall Application enhancement:​
- We have improved both backend and frontend components to enhance the application's speed, stability, and overall performance.
- The application submission process has been optimized to ensure a smoother and faster user experience.
note
- Please review the release notes carefully.
- Use the DMeX Chat Bot for detailed guidance.
- Coordinate with your team to validate new features and report any issues early.
- Contact our support team if you encounter any issues.
Thank you for your continued trust in our system.